Browse Section: Manholes, precast

Manholes, precast

Comm Manhole 4'x4'x4' With Rack, French Drain Complete & Install


Item Rate

Material810.70 / EA
Electricians ($46.83/hour for 2.56 hours) 119.81 / EA
Equip. Operators, Medium Foreman ($42.67/hour for 1.94 hours) 82.69 / EA
Equip. Operators, Medium ($41.30/hour for 15.50 hours) 640.38 / EA
Truck Drivers, Light ($31.72/hour for 7.75 hours) 245.91 / EA
HYD EXCAV,CRWLR, 1.00CY BKT,LONG ($67.69/hour for 7.75 hours) 524.72 / EA
LDR,FE, WH, 2.50 CY, ARTIC, 936E ($48.80/hour for 7.75 hours) 378.27 / EA
REAR DUMP BODY, 8 CY,(30,000 GVW ($4.36/hour for 7.75 hours) 33.79 / EA
TRK,HWY, 46,000 GVW, 6X4, 3 AXLE ($53.40/hour for 7.75 hours) 413.95 / EA
Other0.00 / EA

Total3,250.22 / EA
end of record