Browse Section: Foundation drain, non-perforated

Foundation drain, non-perforated

10"(25cm)Dia Clay Pipe, Fdn Drain


Item Rate

Material7.77 / LF
Laborers, (Semi-Skilled) ($32.49/hour for 0.09 hours) 2.85 / LF
Laborers, (Semi-Skilled) Foreman ($33.85/hour for 0.02 hours) 0.74 / LF
Equip. Operators, Medium ($41.30/hour for 0.02 hours) 0.91 / LF
LDR,BH,WH, 1.38CY FE BKT, 30"DIP ($28.54/hour for 0.02 hours) 0.63 / LF
Other0.00 / LF

Total12.89 / LF
end of record