Browse Section: Foundation drain, non-perforated
Foundation drain, non-perforated
Piping, subdrainage, 8" dia, vitrified clay, non-perforated
| Item | Rate |
|---|---|
| Material | 3.92 / LF |
| Laborers, (Semi-Skilled) Foreman ($33.85/hour for 0.03 hours) | 0.93 / LF |
| Laborers, (Semi-Skilled) ($32.49/hour for 0.11 hours) | 3.59 / LF |
| Equip. Operators, Light ($38.90/hour for 0.03 hours) | 1.07 / LF |
| LOADER/BH, WH, 0.80 CY, F/E BKT 30" DIPPER ($18.31/hour for 0.03 hours) | 0.51 / LF |
| Other | 0.00 / LF |
| Total | 10.02 / LF |