Browse Section: Perforated PVC, schedule 40

Perforated PVC, schedule 40

Piping, subdrainage, perforated PVC, 8" dia


Item Rate

Material3.25 / LF
Laborers, (Semi-Skilled) Foreman ($33.85/hour for 0.03 hours) 0.93 / LF
Laborers, (Semi-Skilled) ($32.49/hour for 0.11 hours) 3.59 / LF
Equip. Operators, Light ($38.90/hour for 0.03 hours) 1.07 / LF
LOADER/BH, WH, 0.80 CY, F/E BKT 30" DIPPER ($18.31/hour for 0.03 hours) 0.51 / LF
Other0.00 / LF

Total9.34 / LF
end of record