Fine grade, granular subbase for highway paving, +/- .1'


Item Rate

Material0.00 / MSY
Laborers, (Semi-Skilled) Foreman ($33.85/hour for 1.00 hours) 33.85 / MSY
Laborers, (Semi-Skilled) ($32.49/hour for 2.00 hours) 64.98 / MSY
Equip. Operators, Medium ($41.30/hour for 3.00 hours) 123.91 / MSY
GRADER, MOTOR, ARTICULATED 28,770 LBS, S/P ($48.46/hour for 1.00 hours) 48.46 / MSY
ROLLER, VIB, TANDEM, S/P 12 TON, 67" WIDE X 51" DIA ($58.51/hour for 1.00 hours) 58.51 / MSY
BLADE, ANGLE, HYDRAULIC (FOR 181 - 250 HP DOZER) ($9.56/hour for 1.00 hours) 9.56 / MSY
DOZER, CRAWLER, 181-250 HP, PS LGP (ADD BLADE) ($115.17/hour for 1.00 hours) 115.17 / MSY
Other0.00 / MSY

Total454.44 / MSY