Browse Section: Siding, yard spur, level grade
Siding, yard spur, level grade
Railroad, sdg, 132lb rail, yd spur, level grade, wd ties & ballast, ARA-A & AREA
| Item | Rate |
|---|---|
| Material | 88.11 / LF |
| Laborers, (Semi-Skilled) Foreman ($33.67/hour for 0.20 hours) | 6.73 / LF |
| Laborers, (Semi-Skilled) ($32.31/hour for 0.80 hours) | 25.85 / LF |
| Equip. Operators, Crane/Shovel ($44.26/hour for 0.20 hours) | 8.85 / LF |
| Equip. Operators, Oilers ($33.50/hour for 0.20 hours) | 6.70 / LF |
| CRANE, HYD, TRUCK MTD, 60 TON 115' BOOM ($110.40/hour for 0.20 hours) | 22.08 / LF |
| Other | 0.00 / LF |
| Total | 158.32 / LF |