Browse Section: Concrete
Concrete
Conc Cutouts, > 6 CF with Bar Reinf Int Elevated Slabs (>.17M3)
| Item | Rate |
|---|---|
| Material | 0.00 / CF |
| AIR COMPR, 375 CFM, 100 PSI ($18.53/hour for 0.13 hours) | 2.47 / CF |
| PAVING BREAKER, 86 LB (ADD COMPR ($1.15/hour for 0.27 hours) | 0.31 / CF |
| Laborers, (Semi-Skilled) ($32.49/hour for 0.53 hours) | 17.33 / CF |
| Laborers, (Semi-Skilled) Foreman ($33.85/hour for 0.13 hours) | 4.51 / CF |
| AIR HOSE, 1.00", 100',HARDROCK ($0.66/hour for 0.27 hours) | 0.17 / CF |
| Other | 0.00 / CF |
| Total | 24.79 / CF |
| end of record | |