Browse Section: Concrete
Concrete
Conc Cutouts, < 6 CF with Bar Reinf Int Elevated Slabs (<.17M3)
| Item | Rate |
|---|---|
| Material | 0.00 / CF |
| AIR COMPR, 375 CFM, 100 PSI ($18.53/hour for 0.16 hours) | 2.97 / CF |
| PAVING BREAKER, 86 LB (ADD COMPR ($1.15/hour for 0.32 hours) | 0.37 / CF |
| Laborers, (Semi-Skilled) ($32.49/hour for 0.64 hours) | 20.79 / CF |
| Laborers, (Semi-Skilled) Foreman ($33.85/hour for 0.16 hours) | 5.42 / CF |
| AIR HOSE, 1.00", 100',HARDROCK ($0.66/hour for 0.32 hours) | 0.21 / CF |
| Other | 0.00 / CF |
| Total | 29.75 / CF |
| end of record | |