Browse Section: Catch Basins Or Manhole
Catch Basins Or Manhole
Demo Concrete Catch Basin or Manhole 5'(1.5M) Deep by 4'(1.2M) Dia
| Item | Rate |
|---|---|
| Material | 0.00 / EA |
| Laborers, (Semi-Skilled) Foreman ($33.67/hour for 0.50 hours) | 16.83 / EA |
| Laborers, (Semi-Skilled) ($32.31/hour for 4.00 hours) | 129.25 / EA |
| Equip. Operators, Medium ($41.08/hour for 2.00 hours) | 82.15 / EA |
| LDR,BH,WH, 1.38CY FE BKT, 30"DIP ($28.38/hour for 2.00 hours) | 56.76 / EA |
| Other | 0.00 / EA |
| Total | 285.00 / EA |
| end of record | |