Browse Section: Catch Basins Or Manhole
Catch Basins Or Manhole
Demo Catch Basin or Manhole Masonry or Concrete, Abandon
| Item | Rate |
|---|---|
| Material | 0.00 / EA |
| Laborers, (Semi-Skilled) Foreman ($33.67/hour for 0.29 hours) | 9.62 / EA |
| Laborers, (Semi-Skilled) ($32.31/hour for 2.29 hours) | 73.85 / EA |
| Equip. Operators, Medium ($41.07/hour for 1.14 hours) | 46.94 / EA |
| LDR,BH,WH, 1.38CY FE BKT, 30"DIP ($28.38/hour for 1.14 hours) | 32.44 / EA |
| Other | 0.00 / EA |
| Total | 162.85 / EA |
| end of record | |