Browse Section: A/E Basic Categories
A/E Basic Categories
Project Manager (Architect / Engineer)
| Item | Rate |
|---|---|
| Material | 0.00 / HR |
| labor | 128.91 / HR |
| equipment | 0.00 / HR |
| Other | 0.00 / HR |
| Total | 128.91 / HR |
| end of record | |