Browse our database

Top of Database
» Site Work
»» Earthwork
»»» Excavation
»»»» Compaction
»»»» Drilling Only
»»»» By Trencher - Chain
»»»» Aggregate
»»»» Foundation Excavation
»»»» Blasting only, rock
»»»» Excavate & load on truck, bank measure
»»»» Excavation, bulk, scrapers
»»»» Excavating, structural
»»»» Excavating, trench or continuous footing
»»»» Excavating, utility trench, plow
»»»» Excavating, utility trench
»»»» Excavate and fill
»»»» Excavation And Loading
»»»» Hauling, loose cubic yards
»»»» Horizontal Boring/Pushing
»»»» Punching/Pushing - Casing Only
»»»» Roadwork, Auger Or Water Boring
»»»» Ripping
»»»» Spread and compact
»»»» Fill
»»»» Loam or topsoil

Excavation

Item Rate
Compaction, riding, vibrating roller, 6" lifts, 2 passes Detail $ 0.24 / CY
Compaction, riding, 6" lifts, 2 passes, sheepsfoot/wobbly wheel Detail $ 0.41 / CY
Compaction, steel wheel tandem roller Detail $ 0.51 / CY
Compaction of backfill, structural, SP roller, 6" lift Detail $ 0.99 / CY
Compaction, struct/trench, walk behind, 6" lifts, 18" wide, vib Detail $ 4.04 / CY
Compaction, by hand, around structures & trenches, air Detail $ 2.76 / CY
Compaction, water, truck, 3000 gal, 3 mile haul Detail $ 0.57 / CY
Compaction, water, truck, 3000 gal, 6 mile haul Detail $ 0.75 / CY
Compaction, water, truck, 3000 gal, 12 mile haul Detail $ 1.08 / CY
Compaction, water, wagon, 6000 gal, 3 mile haul Detail $ 0.42 / CY
Compaction, water, wagon, 6000 gal, 6 mile haul Detail $ 0.52 / CY
Compaction Water Price $.005/Gal ($0.454/100 Liters) Detail $ 0.29 / CY
Compaction Water Price $.010/Gal ($0.908/100 Liters) Detail $ 0.59 / CY
Compaction Water Price $.020/Gal ($1.816/100 Liters) Detail $ 1.18 / CY
Drilling only, 2" hole for rock bolts, average Detail $ 5.21 / LF
Drilling only, 2.5" hole for pre-splitting, average Detail $ 2.74 / LF
Drilling only, rock removal, 30 LF/HR, quarry production drill Detail $ 4.85 / LF
Drilling only, rock removal, 40 LF/HR, quarry production drill Detail $ 3.64 / LF
Drilling only, rock removal, 50 LF/HR, quarry production drill Detail $ 2.91 / LF
Drilling only, rock removal, 60 LF/HR, quarry production drill Detail $ 2.42 / LF
Limit reached, Search or navigate deeper