Browse our database

Top of Database
» Site Work
»» Earthwork
»»» Excavation for Small Jobs
»»» General Excavation, Trenches And Cont. Footings
»»» Rock Removal
»»» Borrow
»»» Excavation/Backfill/Compaction
»»» Excavation
»»» Pavement Base
»»» Soil Stabilization
»»» Vibroflotation
»»» Slope/Erosion Control
»»» Soil Treatment

Earthwork

Item Rate
General/Structural Excavation For jobs 100CY to 500CY in Size Detail $ 11.38 / CY
General/Structural Excavation For Small Jobs Less Than 100CY Detail $ 19.91 / CY
Excavate Around Obstructions In Congested Area (Backhoe/Loader) Detail $ 27.97 / CY
Remove Rock with Hydrolic Impact Tool, Rubbertire Backhoe Detail $ 11.41 / CY
Remove Rock with Hydrolic Impact Tool, Tracked Backhoe Detail $ 7.91 / CY
Sand, Bank Run Detail $ 10.59 / CY
Sand, Washed Detail $ 25.85 / CY
Gravel, Bank Run Detail $ 14.00 / CY
Crushed Stone 3/4" Detail $ 28.12 / CY
Common Borrow Material Detail $ 7.32 / CY
Top Soil, Weed Free Detail $ 31.94 / CY
Backfill, by hand, no compaction, light soil Detail $ 18.46 / CY
Backfill, by hand, compaction in 6" layers, air tamp Detail $ 7.52 / CY
Backfill, trench, dozer, no compaction Detail $ 0.64 / CY
Backfill, trench, front-end loader no compaction Detail $ 2.14 / CY
Backfill, spread dumped gravel/fill, dozer, 6" layers, Detail $ 0.40 / SY
Backfill, spread dumped gravel/fill, dozer, 12" layers Detail $ 1.63 / SF
Backfill, sand bedding trenches, front-end loader, 1.5 CY Detail $ 34.50 / CY
Backfill, strl, sand & gravel, no compact, 50' haul Detail $ 0.70 / CY
Backfill, strl, 6" lifts, by hand, no compaction, around Detail $ 23.27 / CY
Limit reached, Search or navigate deeper