Browse our database
Top of Database» Site Work
»» Earthwork
»»» Excavation for Small Jobs
»»» General Excavation, Trenches And Cont. Footings
»»» Rock Removal
»»» Borrow
»»» Excavation/Backfill/Compaction
»»» Excavation
»»» Pavement Base
»»» Soil Stabilization
»»» Vibroflotation
»»» Slope/Erosion Control
»»» Soil Treatment
Earthwork
| Item | Rate |
|---|---|
| General/Structural Excavation For jobs 100CY to 500CY in Size Detail | $ 11.38 / CY |
| General/Structural Excavation For Small Jobs Less Than 100CY Detail | $ 19.91 / CY |
| Excavate Around Obstructions In Congested Area (Backhoe/Loader) Detail | $ 27.97 / CY |
| Remove Rock with Hydrolic Impact Tool, Rubbertire Backhoe Detail | $ 11.41 / CY |
| Remove Rock with Hydrolic Impact Tool, Tracked Backhoe Detail | $ 7.91 / CY |
| Sand, Bank Run Detail | $ 10.59 / CY |
| Sand, Washed Detail | $ 25.85 / CY |
| Gravel, Bank Run Detail | $ 14.00 / CY |
| Crushed Stone 3/4" Detail | $ 28.12 / CY |
| Common Borrow Material Detail | $ 7.32 / CY |
| Top Soil, Weed Free Detail | $ 31.94 / CY |
| Backfill, by hand, no compaction, light soil Detail | $ 18.46 / CY |
| Backfill, by hand, compaction in 6" layers, air tamp Detail | $ 7.52 / CY |
| Backfill, trench, dozer, no compaction Detail | $ 0.64 / CY |
| Backfill, trench, front-end loader no compaction Detail | $ 2.14 / CY |
| Backfill, spread dumped gravel/fill, dozer, 6" layers, Detail | $ 0.40 / SY |
| Backfill, spread dumped gravel/fill, dozer, 12" layers Detail | $ 1.63 / SF |
| Backfill, sand bedding trenches, front-end loader, 1.5 CY Detail | $ 34.50 / CY |
| Backfill, strl, sand & gravel, no compact, 50' haul Detail | $ 0.70 / CY |
| Backfill, strl, 6" lifts, by hand, no compaction, around Detail | $ 23.27 / CY |
| Limit reached, Search or navigate deeper | |