Browse our database
Top of Database» General Requirements
»» General Maintenance
»»» Door & Window
General Maintenance
| Item | Rate |
|---|---|
| Washing windows, by window area, average productivity Detail | $ 10.07 / CSF |
| Survey Clear Area With Few To No Obstacles Detail | $ 97.19 / ACR |
| Survey Clear Area with Medium Hgt Vegetation, Few Trees (<5% Building) Detail | $ 232.62 / ACR |
| Survey Clear Area with Few Structures, &/Or Wooded (5-25% Buildings) Detail | $ 329.78 / ACR |
| Survey Developed Areas with Several Structures (25-65% Buildings) Detail | $ 518.51 / ACR |
| Survey Highly Developed Areas, Sidewalks, Etc. (>65% Buildings) 65-Percent--Buildings)>Detail | $ 665.93 / ACR |
| Survey Property Lines On Cleared Land Detail | $ 0.49 / LF |
| Survey Property Lines On Slighty Wooded Land Detail | $ 0.57 / LF |
| Survey Property Lines On Wooded Land Detail | $ 0.66 / LF |
| Surveyor Stakes 2x2, 24 Inch Length (With Labor For Detail | $ 1.65 / EA |
| Aerial Photgraphy, 1 Site Within City, 15-20 Shoots, 6 Proofs Detail | $ 571.37 / EA |
| Principle Detail | $ 138.74 / HR |
| Project Manager (Architect / Engineer) Detail | $ 125.52 / HR |
| Senior Architect Detail | $ 112.31 / HR |
| Junior Architect Detail | $ 99.10 / HR |
| Senior Civil Engineer Detail | $ 105.70 / HR |
| Junior Civil Engineer Detail | $ 99.10 / HR |
| Senior Mechanical Engineer Detail | $ 105.70 / HR |
| Junior Mechanical Engineer Detail | $ 99.10 / HR |
| Senior Electrical Engineer Detail | $ 105.70 / HR |
| Limit reached, Search or navigate deeper | |