Contract Closeout

Item Rate
Existing Debris Removal & Disposal Detail $ 4.38 / CSF
Cleanup, floor area, final Detail $ 6.02 / CSF
Cleanup, clean & polish floors Detail $ 2.64 / CSF
Washing windows, by window area, average productivity Detail $ 10.34 / CSF
Survey Clear Area With Few To No Obstacles Detail $ 99.81 / ACR
Survey Clear Area with Medium Hgt Vegetation, Few Trees (<5% Building) Detail $ 238.89 / ACR
Survey Clear Area with Few Structures, &/Or Wooded (5-25% Buildings) Detail $ 338.66 / ACR
Survey Developed Areas with Several Structures (25-65% Buildings) Detail $ 532.47 / ACR
Survey Highly Developed Areas, Sidewalks, Etc. (>65% Buildings) 65-Percent--Buildings)>Detail $ 683.86 / ACR
Survey Property Lines On Cleared Land Detail $ 0.50 / LF
Survey Property Lines On Slighty Wooded Land Detail $ 0.58 / LF
Survey Property Lines On Wooded Land Detail $ 0.68 / LF
Surveyor Stakes 2x2, 24 Inch Length (With Labor For Detail $ 1.69 / EA
Aerial Photgraphy, 1 Site Within City, 15-20 Shoots, 6 Proofs Detail $ 586.76 / EA
Principle Detail $ 142.47 / HR
Project Manager (Architect / Engineer) Detail $ 128.90 / HR
Senior Architect Detail $ 115.33 / HR
Junior Architect Detail $ 101.77 / HR
Senior Civil Engineer Detail $ 108.55 / HR
Junior Civil Engineer Detail $ 101.77 / HR